Use of racking, rails and SafeSort is optional and dependent upon the application.
Contact Bioquell if a specific item is required.
4.2.2Opening Doors
To open either of the side doors to enable the load to be transferred into a QEXT
Module or QMTD or out of the QUBE system, press the foot switch below the door
on the handle side to deflate the seal and then pull up the handle.
The doors can only be opened if it is safe to do so. The door indicator is
illuminated green when they can be unlocked and flashes green when they can be
opened.
4.3 Bio-decontamination Mode
Load the items to be gassed into the QHPV chamber as described in Section
4.2.1, ensuring good gassing presentation (occluded surface area of load is
minimised). Specialist rails, racking and accessories are available from Bioquell
for this purpose.
4.3.1Preparing to Start a Cycle
Ensure sleeves are in correct position prior to starting a cycle; for positive
pressure cycles refer to Figures 27 & 28 below. For negative pressure cycles fully
extend the gloves and hang off internal racking or if not present use hanging rail
(TD069-6300)
Figure 27: Attached by magnet to front window
Figure 28: Correct position for gassing