Operation
52 Z33081_00_001
WARNING
Thegeneratorhasnomeansofdetectingthenatureoftheresidualgas
isinthecontainer.
1. Itis theresponsibilityoftheusertoensureonlytoconnectcontainersthathave
beenusedexclusivelyforhydrogen.
2. Connecting containers with residual gases other than hydrogen can lead to
contaminationandblockageoftheBPHG90.
The batch delivery continues until a predefined pressure has been reached or until
aborted by the user. The delivery process also stops when the preset timeout has
elapsed.ProgressisindicatedintheBatchDeliveryscreen(seethefigureBatch delivery
progress screen [}51]).
Thepressureandtimeoutparameterscanbesetbytheuser(seethesectionAdjustable
Parameters [} 46]). During the procedure, the elapsed time and the pressure in the
containeraredisplayedontheBatchDeliveryscreen.Aftercompletion,theuserisasked
to confirm that the container has been removed (see the figure End of Batch Delivery
Process [}51]).
Figure7.19:BatchDeliveryProgressScreen