EasyManua.ls Logo

Bruker BPHG 90 - Generator Shut-down

Bruker BPHG 90
78 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation
Z33081_00_001 53
Figure7.20:EndofBatchDeliveryProcess
7.6 GeneratorShutdown
TheBPHG90canbeleftinReadymodewithoutdetrimentaleffectstotheinstrument.If,
however,itisenvisagedthatnoparahydrogenisrequiredforaprolongedperiodoftime,it
isrecommendedthatthesystembeswitchedoff.Itisnotrecommended,however,thatthe
BPHG 90 is switched off by means of the main power switch when the conversion
chamber is cold. This could lead to pressure build up in the conversion chamber and (a
small amount of) H
2
gas being released through the pressure safety valves in the
instrument.
Thepreferredprocedureforswitchingthesystemoffisbyfirstwarmingitupasdescribed
inthefollowingsection.
7.6.1 WarmUp
Upon terminating either of the two delivery modes, the BPHG 90 returns to the Ready
screen. When the user presses the Exit button on this screen the system will return to
StandbyfromwhichaforcedwarmupcanbeinitiatedbytappingtheWarmUpbutton.
The Warm Up procedure allows the user to warm the system up quickly to a preset
temperatureinordertoclearasuspectedconversionchamberblockage,orinpreparation
forasystemshutdown.
A forced warmup takes typically less than 20 minutes. When the Warmup button is
pressed, the system asks for a user confirmation (Warm up dialogue and information
screen [} 53]) and then proceeds to heat the conversion chamber under continuous
pumpingontheworkingvolume.

Table of Contents

Related product manuals