EasyManua.ls Logo

Calix ODC-80 - Page 34

Calix ODC-80
108 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
28
Calix ODC-80 Installation Guide
Proprietary Information: Not for use or disclosure except by written agreement with Calix.
© 2001-2003 Calix. All Rights Reserved.
Procedure to test the cabinet ground
Step Action
1.
In the splice compartment, attach one lead from an Ohm meter to the
terminal lug of the ground cable.
2.
Attach the second lead from the Ohm meter to the ground bar.
3.
Verify that the Ohm meter reads 1 Ohm or less.

Table of Contents

Related product manuals