CHAPTER 4 - OPERATING INSTRUCTIONS
4-19
6-34551NA Issued 8-04 Bur
CT02D066A
Figure 60
6. Make sure that the switch (1) located on the
left-hand arm is in the desired position.
CT02C228
Figure 61
7. Operate the Option Pedal. See Option Pedal in
the Controls/Instruments/Accessories section.
CT02C235
Figure 62
8. When removing the demolition grab, turn the
supply valves to the closed position (-), and plug
them.
CT02C124
Figure 63
9. Toggle the switch to the bucket position then
bring the flow selector valve into position (B).
CT02C236