e)
the
location
and
size
of
concealed
roof
or
ceiling
voids
,
,
offices
and
other
enclosures
sealed
at
a
level
lower
than
the
roof
or
ceiling
proper;
f)
indication
of
trunking,
stagings,
platforms,
machinery,
light
fittings,
heaters,
suspended
open
cell
ceilings
etc.
which
may
adversely
affect
the
sprinkler
distribution;
g)
the
sprinkler
type(s)
and
temperature
rating(s);
h)
the
type
and
approximate
location
of
pipe
supports;
i)
the
location
and
type
of
control
valve
sets
and
location
of
water
motor
alarms;
j)
the
location
and
details
of
any
water
flow,
and
air
or
water
pressure
alarm
switches;
k)
the
location
and
size
of
any
subsidiary
valves,
subsidiary
stop
valves
and
drain
valves;
1)
the
drainage
slope
of
the
pipework;
m)
a
schedule
listing
the
numbers
of
sprinklers
and
the
area
of
protection;
n)
the
location
of
all
test
valves;
o)
the
location
and
details
of
any
alarm
panel;
p)
the
location
and
details
of
any
fire
department
inlet
connections;
q)
a
key
to
the
symbols
used.
NOTE:
details
of
other
services
should
not
appear
on
sprinkler
drawings
except
insofar
as
they
are
necessary
for
the
correct
installation
of
the
sprinkler
system.
3.4.3.2 Pre-calculated pipework
For
pre-calculated
pipework
the
following
details
shall
be
given
on,
or
with,
the
drawings:
a)
identification
of
the
design
point
of
each
array
on
the
layout
drawing
(for
example,
as
in
Figure
H4);
b)
a
summary
of
the
pressure
losses
between
the
control
valve
set
and
the
design
points
at
the
following
design
rates
of
flow:
1)
in
an
LH
installation
2251/min;
2)
in
an
OH
installation
10001/min;
3)
in
an
HH
installation
the
low
corresponding
to
th
design
density
given
in
Table
8;
c)
the
calculation
as
specified
in
G.2,
showing
that:
1)
in
LH
and
OH
installations,
for
each
run
of
distribution
pipework;
p
f
-
p
h

Table of Contents