Evolution® IP-20LH Installation Guide
Ceragon Proprietary and Confidential Page 52 of 101
5.3 PDC Installation and Replacement
5.3.1 Order of Installation
In a 1RU chassis, the PDC must be installed in PDC Slot 1.
In a 2RU chassis, the first PDC must be installed in PDC Slot 1. Optionally, you
can install a second PDC in PDC Slot 2.
For slot numbering, refer to Slot Population Guidelines on page 15.
5.3.2 Installing a PDC
1. Insert the PDC
into the
appropriate
slot in the
chassis, and
secure it using
two captive
screws.
2. Fasten the two
captive screws
manually.
3. Connect the
power cable,
as described
in Connecting
the Power
Cable on
page 82.