Edge MAXX Installation
2-1
Chapter 2
INSTALLATION
This chapter contains installation instructions for the Edge feeder. It includes:
2.1 Site and Utility Requirements
2.2 Installation Procedures
2.3 Pre-Operational Checkouts
The unit was tested under load conditions at the factory and inspected to ensure proper operation.
It was shipped in working condition and is completely assembled. Sufficient strapping, blocking, and
bracing were provided to give reasonable assurance that no shipping damage would occur.
NOTE: Notify the carrier at once if the unit is received in damaged condition.
Chicago Dryer Company’s responsibility for shipping damage, other than the standard warranty,
ceases upon delivery to the carrier. For more information on the warranty, see the full page warranty
statement at the front of this manual.