EasyManua.ls Logo

Cinergia GE+ - Page 58

Cinergia GE+
121 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE+ ACDC Installation and operation manual v11
58 / 121
III. Unipolar parallel mode
In case of working in parallel mode the user must use 3 cables in the positive outputs
(X6, X7 and X8) or use a bridge which put together all 3 phases. The negative outputs
(X20, X21 and X22) must also be bridged in case of using only one cable.
It is possible to change the position of the switches in any state different than Run.
If the new position is not allowed, there will appear the Wrong Connection alarm.

Table of Contents

Related product manuals