4.3. Equipment reception
4.3.1. Unpacking and checking the content
On receiving the device, make sure that the power supply has not suffered any damage during
the transportation. Otherwise, make all pertinent claims to the supplier or to CINERGIA.
The packing of the device consists of a wooden palette, a cardboard or wooden packaging
(depending on the case), expanded polystyrene corner pieces, a polyethylene sleeve and bands;
all recyclable materials. Therefore, they should be disposed of according to current regulations.
We recommend keeping the packaging in case its use is necessary in the future.
To unpack, cut the bands and remove the cardboard packaging with a vertical movement. In
case of wooden packaging, remove it with the appropriate tools. Afterwards, remove the corner
pieces and the plastic sleeve. At this point the equipment will be unpacked on the pallet. Please,
use suitable tools to lower the power supply from the pallet.
After unpacking the equipment, check that the data in the nameplate (stuck on the inner part
of the front door) correspond to those specified in the purchase order. Contact the supplier or
CINERGIA in case of disconformities.
Keep the equipment in the original package if it will not be used to protect it from any possible
mechanical damages, dust, dirt, etc…
4.3.2. Storage
The equipment shall be stored in a dry, ventilated place and protected against rain, water jets
or chemical agents. It is advisable to keep the power supply into its original package, which has
been designed to assure the maximum protection during the transport and storage.
Do not store the unit where the ambient temperature exceeds 40ºC or falls below
-20ºC
4.3.3. Transport to location
The equipment includes castors to facilitate its transport to its final location.
It is important to check previously if the weight of the power supply is appropriate for the site
where it will be located.
It is also important to consider the most suitable means to place the power supply in its final
location (floor, hoist, lift, stairs, etc…).
4.3.4. Location
It is necessary to leave a minimum of 25 cm in the contour of the equipment for its ventilation.
If possible, as shown in following figures, it is recommended to leave additional 75 cm to