EasyManua.ls Logo

Cisco cBR Series - Page 133

Cisco cBR Series
270 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
If you are using a chassis-mounted snap-on plastic fiber/cable routing guide, route the fiber-optic cables through the
upper slot of the snap-on plastic fiber/cable routing guide and then through the upper slot of the Supervisor PIC
cable management bracket. Secure the cable bundle using cable ties.
If you are using a chassis-mounted cable strap-down clip without the snap-on plastic fiber/cable routing guide, route
the fiber-optic cables through the upper slot of the Supervisor PIC cable management bracket. Secure the cable
bundle to the upper tie down point on the strap-down clip using a cable tie.
The following figures illustrate the possible cable routing options for the fiber-optic cables connected to the Supervisor
PIC:
Figure 88: Routing the Fiber-Optic Cables Connected to the Supervisor PICOption 1
Supervisor PIC cable management bracket3Snap-on plastic fiber/cable routing guides1
Fiber-optic cable bundle2
Cisco Converged Broadband Routers Hardware Installation Guide
125
Installing the Supervisor in the Cisco cBR Chassis
Cable Management for the Supervisor PIC in the Cisco cBR Chassis

Table of Contents

Other manuals for Cisco cBR Series

Related product manuals