Figure 126: Removing the Supervisor Card from the Chassis
Step 4 Grasp the faceplate of the card with one hand and place your other hand under the card to support its weight, and remove
the card from its slot.
Step 5 Place the removed Supervisor Card in an antistatic bag.
The removed blank card does not need to be placed in an antistatic bag.
Note
What to do next
• Replace the Supervisor Card or blank card.
Removing the SFP+ Module from the Supervisor PIC
Before you begin
Do not install or remove the SFP+ module with fiber-optic cables still attached to it. Doing so may damage
cables, cable connectors, or the optical interfaces and may interfere with the SFP+ module latching properly
into its socket connector. Disconnect all cables before removing or installing an SFP transceiver module.
Caution
• Attach an ESD-preventive wrist strap to your wrist and connect the other end to the grounding lug
connected to the chassis.
• Removing and installing an SFP+ module can shorten its useful life. Do not remove and insert SFP+
modules more often than is absolutely necessary.
Required Tools and Equipment
• ESD-preventive wrist strap
Cisco Converged Broadband Routers Hardware Installation Guide
202
Maintaining the Supervisor in the Cisco cBR Chassis
Removing the SFP+ Module from the Supervisor PIC