What to do next
Replace the Supervisor PIC or blank PIC.
Maintaining the Supervisor 250G
Removing the Supervisor Card from the Cisco cBR Chassis
Perform this procedure to remove the following cards:
Supervisor Card
Blank card for the Supervisor
Before you begin
In a Cisco cBR with 1+1 Supervisor redundancy, removing the active Supervisor Card or Supervisor
PIC results in switchover.
In a Cisco cBR with 1+1 Supervisor redundancy, removing the standby Supervisor Card or Supervisor
PIC may result in limited packet loss in the active-active backhaul configuration.
In a Cisco cBR without Supervisor redundancy, removing the Supervisor Card or Supervisor PIC results
in complete loss of service.
Caution
Attach an ESD-preventive wrist strap to your wrist and connect the other end to the grounding lug
connected to the chassis.
Disconnect all the cables and memory stick or flash drives from the Supervisor Card.
Close the tethered I/O door by pushing the door until it snaps into place on the spring-loaded ejector of
the Supervisor Card.
Figure 131: Closing the Tethered I/O Door on the Supervisor Card
Tethered I/O door1
Cisco Converged Broadband Routers Hardware Installation Guide
207
Maintaining the Supervisor in the Cisco cBR Chassis
Maintaining the Supervisor 250G

Table of Contents

Other manuals for Cisco cBR Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Cisco cBR Series and is the answer not in the manual?

Cisco cBR Series Specifications

General IconGeneral
BrandCisco
ModelcBR Series
CategoryNetwork Router
LanguageEnglish

Related product manuals