InteliMains
NT
, SW version 3.2.0
InteliMains-NT-MCB-MGCB-3.2.0-Reference Guide.pdf, ©ComAp – April 2015
- Island and Parallel operations are possible.
- Transfer with synchronization from Island to
Parallel is enabled
- Gen-sets will be started when the Mains fails.
- Gen-sets will synchronize directly to the Mains
(MGCB already closed), i.e. synchronization
transfer from Mains to Parallel
- MGCB will be closed if the MCB is closed
- Island and Parallel operations are possible.
- Transfer with synchronization from Island to
Parallel is enabled
- Gen-sets will not be started when the Mains
fails.
- Gen-sets will synchronize directly to the Mains
(MGCB already closed), i.e. synchronization
transfer from Mains to Parallel
- MGCB will be closed if the MCB is closed
- Island operation is possible.
- Transfer with synchronization is N/A
- Gen-sets will be started when the Mains fails.
- Island operation is possible.
- Transfer with synchronization is N/A
- Gen-sets will not be started when the Mains
fails.
- Island operation is possible.
- Transfer with synchronization is N/A
- Gen-sets will be started when the Mains fails.
- MGCB will be closed if the MCB is closed
- Island operation is possible.
- Transfer with synchronization is N/A
- Gen-sets will not be started when the Mains
fails.
- MGCB will be closed if the MCB is closed
- Parallel operation is possible.
- Transfer with synchronization from Mains to
Parallel is enabled
- Gen-sets will not be started when the Mains
fails.
- Gen-sets will first synchronize on the bus before
synchronizing via MGCB
- Parallel operation is possible.
- Transfer with synchronization via InteliMains is
N/A
- Gen-sets will not be started when the Mains
fails.
- Gen-sets will synchronize directly to the Mains
(MGCB already closed), i.e. synchronization
transfer from Mains to Parallel