InteliMains
NT
, SW version 3.2.0
InteliMains-NT-MCB-MGCB-3.2.0-Reference Guide.pdf, ©ComAp – April 2015
170
180
190
200
210
220
230
240
250
260
RHE
Step
1 2 3 4 5
Figure: Running Hours Equalization example, 2 gen-sets
From the example of the case #1, it can be concluded that the gen-sets are swapped after the
duration determined by following formula:
SwapTime = Second lowest considered running hours – Current lowest considered running
hours + #RunHrsMaxDiff +1
Case #2:
Gen-set 1 running hours = 0 -> running hours considered in RHE = 0 (0-RunHoursBase)
Gen-set 2 running hours = 0 -> running hours considered in RHE = 0 (0-RunHoursBase)
Gen-set 3 running hours = 0 -> running hours considered in RHE = 0 (0-RunHoursBase)
Each gen-set has the same RHE = 0 h. By applying the SwapTime formula, we get the run time of
gen-set 1 before next swapping:
SwapTimeG1 = 0 – 0 + 10 + 1 = 11
Similar way, we get the run time of gen-set 2 before next swapping:
SwapTimeG2 = 11 – 11 + 10 + 1 = 11