EasyManua.ls Logo

Condair RM2 - Notes on Operation; Inspections During Operation

Condair RM2
72 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
17Operation
4.4 Notes on operation
After 24 hours in standby operation (no humidity demand), the steam tank is emptied automatically. The
steam tank remains empty and is not lled until a steam demand is present or the humidifying operation
is started manually.
If, during operation, it is recognized that consistently foaming occurs in the steam tank, the carbonate
hardness setting of the inlet water should be increased. As a result, the steam tank of the Condair RM
is drained more frequently and thus the foam formation is counteracted.
4.5 Inspections during operation
During operation the Condair RM and the humidication system have to be inspected weekly. On this
occasion check the following:
the water and steam installations for any leaks.
the steam humidier and the other system components for correct xing and any damage.
the electric installation for any damage.
If the inspection reveals any irregularities (e.g. leakages, error indication) or any damaged components take
the Condair RM out of operation as described in chapter 4.6. Then, contact your Condair representative.

Table of Contents

Related product manuals