EasyManua.ls Logo

cytiva BPG Columns - Page 114

cytiva BPG Columns
146 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Step Action
5 Close the column outlet valve.
A
B
C
Pressure relief valve
6 Raise the pressure to maximum working pressure. Note that pressure spikes
m
ay cause poor packing (cracking).
A pressure relief valve should be placed between the pump and column.
WARNING
T
he working pressure of the column should never
exceed its design pressure, otherwise there is a risk of
personal injury and damage to the column. Always use
appropriate safety equipment, for example pressure
relief valve or rupture discs.
7 Wait about 15 minutes until the pressure has stabilized.
8 Check the pressure drop on the pressure gauge. The pressure drop should
n
ot exceed 0.1 bar during 5 minutes. A recorder linked to a pressure
controller gives more precise figures.
6 Maintenance
6
.6 Leakage test
114
BPG Columns Operating Instructions 29193223 AB

Related product manuals