4.1 Site requirements
S
pace and floor load
For space and floor load requirements, refer to the dimensions and weight information
in the product documentation provided with each column. Make sure the floor can
handle the weight of the BPG columns at fully loaded conditions.
In order to allow convenient working conditions for the operator, sufficient space
should be provided on all sides of the column when it is installed at the intended
production location.
Equipment requirements
When transporting and maneuvering BPG columns and adapters the following equip-
ment is recommended:
Suitable lifting equipment (crane or hoist) for the larger BPG columns, see Moving
the adapter BPG 300 and BPG 450, on page 76.
Lifting eyebolts.
Ambient environment
The following should be avoided:
Direct sunlight
Vibrations
Corrosive gas
Dust
4 Installation
4
.1 Site requirements
34
BPG Columns Operating Instructions 29193223 AB