4.3 Unpacking
T
ools required for crate unpacking
The following tools are recommended when removing larger BPG columns from the
transport crate:
• Suitable lifting equipment, such as a crane or hoist
• Round slings or lifting chains with the capacity to safely lift the weight of the column
• Lifting eyebolts
• Screwdriver
• Suitable wrench or ratchet wrench
Crate unpacking
WARNING
O
nly personnel with appropriate training may move and unpack
the delivery crates. All moving and unpacking must be performed
according to local regulations.
Even if the safety instructions in the user documentation are
followed, it is the customers' responsibility to guarantee the safety
of the personnel working with BPG columns.
Unpack the BPG 300 and 450 columns by following the unpacking instructions
a
ttached to the outside of the transport crate. In the absence of unpacking instruc-
tions, unpack BPG column from the transport crate as follows:
Step Action
1 Move the crate to a protected indoor location. Make sure that the transport
c
rate is located on a level and even floor surface.
2 Remove the screws marked with black paint from the side panel of the trans-
port crate, and carefully remove that side panel from the crate.
3 Remove the top panel from the crate.
4 Remove the enclosed accessories that are packed inside the crate.
5 Place the ramp that is provided inside the crate on the floor surface.
6 Secure the ramp tightly against the open side of the crate. Make sure there is
a smooth transition between the bottom of the crate and the floor.
7 Release the column wheel brakes and carefully roll the column out of the
crate and onto the floor.
4 Installation
4
.3 Unpacking
36
BPG Columns Operating Instructions 29193223 AB