5.2.2 Preparing the adapter
P
osition and seal the adapter
Step Action
1 Connect the 4-port, 4-way valve, to the top of the adapter.
2 Position the valve from pump to waste (A to C) to purge air and start the
p
ump.
3 Stop the pump once all air is removed.
4 Position the valve from adapter to waste (B to C).
5 Operation
5
.2 Column packing
5.2.2 Preparing the adapter
BPG Columns Operating Instructions 29193223 AB 57