Positioning the column
WARNING
H
ave a minimum of two people on hand, as well as the appropriate
lifting equipment for the application, such as a hoist, when moving
or lifting a heavier BPG column, i.e., BPG 300 or 450.
The BPG column can be rolled to the intended operational location on its own wheels,
o
r the larger columns can be lifted into position using a crane or hoist.
Tip:
It is recommended to wrap PTFE tape around the threads of the eyebolts
used with BPG column.
Cleaning column surfaces
B
efore beginning to prepare the column for operation it is recommended that any
surface residues acquired during transport or removal of the column from the packing
crate are removed using warm water and/or 20% ethanol.
4 Installation
4
.3 Unpacking
BPG Columns Operating Instructions 29193223 AB 37