After storage
W
hen the BPG column is going to be taken into operation after storage, follow the
instructions below:
Step Action
1 Disassemble the column.
2 Perform routine maintenance, i.e., replace O-rings etc.
3 Thoroughly dry all column components.
4 Assemble the column.
6 Maintenance
6
.8 Storage
120
BPG Columns Operating Instructions 29193223 AB