EasyManuals Logo

Daikin VRV System R-22 PLUS Series User Manual

Daikin VRV System R-22 PLUS Series
176 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #10 background imageLoading...
Page #10 background image
Points to Bear in Mind at the System Design SiE33-102
8 General Information
2.3 Striking a Balance between System Installation and General Construction
Work (Comprehensive Flow Chart)
Note: 1. The division of the work should be thoroughly clarified. (This applies particularly to work relating to the
connection of control wiring, fitting of remote control and central control panel, boundary work on areas
such as connection of drain piping and humidification supply piping, inspection and foundation)
2. Keep a constant check on the progress of the construction work to avoid deviations from the air
conditioning work schedule.
3. For sleeve and insert work the positions of ceiling girders should be confirmed and sleeve and insert
requirement, hole diameters, positioning and numbers decided. This is particularly important in the case
of sleeves for drain piping.
Si33-102.book Page 8 Tuesday, June 26, 2001 3:18 PM
Все каталоги и инструкции здесь: http://splitoff.ru/tehn-doc.html

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Daikin VRV System R-22 PLUS Series and is the answer not in the manual?

Daikin VRV System R-22 PLUS Series Specifications

General IconGeneral
BrandDaikin
ModelVRV System R-22 PLUS Series
CategoryAir Conditioner
LanguageEnglish

Related product manuals