SiE33-102 Inspecting and Handling the Unit
Installation Manual 139
4. Inspecting and Handling the Unit
4.1 Inspecting and Handling the Unit
The units are packed in a wooden crate and attached on a wooden pallet.
At delivery, the package should be checked and any damage should be reported immediately to the carrier
claims agent.
When handling the unit, take into account the following:
1. Fragile, handle the unit with care.
Keep the unit upright in order to avoid compressor damage.
2. Lift the unit preferably with a crane and 2 belts of at least 8m or 10m (RXY16,20) long.
3. When lifting the unit with a crane, always use protectors to prevent belt damage and pay attention to the
position of the unit’s centre of gravity.
4. Bring the unit as close to its final installation position in its original package to prevent damage during
transport.
Rope
RXY8,10
RXE8,10
Sequencer
RXY16,20
Rope
Sequencer
Sequencer
(V1836)
Si33-102.book Page 139 Tuesday, June 26, 2001 3:18 PM
Все каталоги и инструкции здесь: http://splitoff.ru/tehn-doc.html

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Daikin VRV System R-22 PLUS Series and is the answer not in the manual?

Daikin VRV System R-22 PLUS Series Specifications

General IconGeneral
BrandDaikin
ModelVRV System R-22 PLUS Series
CategoryAir Conditioner
LanguageEnglish

Related product manuals