SiE33-102 Installation
General Information 17
Covering of
Refrigerant Pipes
Covering is an extremely important operation as it prevents water, dirt or dust from getting inside
the pipes. Moisture inside the pipes was a constant source of trouble in the past. The utmost care is
required to nip this problem in the bud.
The end of each pieces of pipe must be covered. “Pinching” is the most effective method but “taping” is
an simple alternative which may be used according to the work area and term of work.
1. Pinching method
The end of the copper pipe is squeezed together and the gap brazed.
2. Taping method
The end of the copper pipe is covered with PVC tape (vinyl tape).
<Taping method>
Particular care should be taken during the following operations:
When passing copper pipe through a penetration hole (Dirt easily gets into the pipe).
When copper pipe is located outside (Rainwater gets in )
(Special care is needed when the pipes are standing vertically outside)
Location Term of Work Covering Method
Outdoors 1 months or more Pinching
Less than 1 months Pinching or taping
Indoors Irrelevant Pinching or taping
Si33-102.book Page 17 Tuesday, June 26, 2001 3:18 PM
Все каталоги и инструкции здесь: http://splitoff.ru/tehn-doc.html

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Daikin VRV System R-22 PLUS Series and is the answer not in the manual?

Daikin VRV System R-22 PLUS Series Specifications

General IconGeneral
BrandDaikin
ModelVRV System R-22 PLUS Series
CategoryAir Conditioner
LanguageEnglish

Related product manuals