Installation SiE33-102
16 General Information
Method for
Replacing Nitrogen
(Brazing)
If brazing work is carried out without passing nitrogen gas through the pipes which are being brazed then
this allows the formation of oxidation bubbles on the inside surface of the pipes. These oxidation bubbles
are then carried along inside the pipes to cause damage to various members of the system such as valves
or compressors and the system ceases to function properly.
In order to avoid this problem nitrogen is passed through the pipes while the soldering work is being
carried out. This operation is known as nitrogen replacement. (Air is replaced by nitrogen)
This is standard work practice for all brazing work.
Important points:
1. The gas used must be nitrogen (oxygen, carbon dioxide and refrigerant should not be used.)
2. A pressure regulator must be used.
Si33-102.book Page 16 Tuesday, June 26, 2001 3:18 PM
Все каталоги и инструкции здесь: http://splitoff.ru/tehn-doc.html

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Daikin VRV System R-22 PLUS Series and is the answer not in the manual?

Daikin VRV System R-22 PLUS Series Specifications

General IconGeneral
BrandDaikin
ModelVRV System R-22 PLUS Series
CategoryAir Conditioner
LanguageEnglish

Related product manuals