A Control terminals
C Grounding terminals
B Motor terminals
Illustration 20: FR9 Terminals
6.5 Installing the Cables
Context:
Use these instructions to find the installation instructions of the correct enclosure size.
Procedure
1. Check the requirements related to lengths, distances, and positioning of the cables according to instructions in 6.5.1 Additional
Instructions for Cable Installation.
2. Follow the installation instructions of the correct enclosure size. To check the enclosure size of the AC drive, see 3.5 Enclosure Sizes.
• 6.5.2 Installing the Cables, FR4-FR6
• 6.5.3 Installing the Cables, FR7
•
6.5.4 Installing the Cables, FR8
• 6.5.5 Installing the Cables, FR9
• 6.5.6 Installing the Cables, FR10-FR11
Electrical Installation
Operating guide | VACON® NXS/NXP Air-cooled
DPD00910G
56 | Danfoss A/S © 2018.06