Figure 91. C5-2: 16 x U.2 G4 RAID SmartFlow (Two PERCs) (w/ FPERC11 N)
NOTE:
Follow the sequential order as shown in the table to remove the cables, to install the cables follow the reverse
sequential order.
Table 89. 16 x U.2 G4 RAID SmartFlow (Two PERCs) (w/ FPERC11 N)
Order From To
1 SIG_PWR_1 (system board power connector) BP_PWR_1 (backplane power connector)
2 SL1_CPU2_PA4 (signal connector on system
board)
CTRL_DST_PA1 (fPERC input connector)
3 SL5_CPU1_PB2 (signal connector on system
board)
CTRL_DST_PA1 (fPERC input connector)
4 SIG_PWR_2 (system board power connector) BP_PWR_1 (backplane power connector)
5 CTRL_SRC_PB1 (fPERC controller connector) DST_PA2 (backplane signal connector) and
DST_PB2 (backplane signal connector)
6 CTRL_SRC_PA1 (fPERC controller connector) DST_PA1 (backplane signal connector) and
DST_PB1 (backplane signal connector)
124 Installing and removing system components