Figure 92. C5-3: 16 x U.2 G4 RAID SmartFlow (Two PERCs) (w/ FPERC12)
NOTE:
Follow the sequential order as shown in the table to remove the cables, to install the cables follow the reverse
sequential order.
Table 90. 16 x U.2 G4 RAID SmartFlow (Two PERCs) (w/ FPERC12)
Order From To
1 SIG_PWR_1 (system board power connector) BP_PWR_1 (backplane power connector)
2 SL1_CPU2_PA4 (signal connector on system
board)
CTRL_DST_PA1 (fPERC input connector)
3 SL2_CPU2_PB4 (signal connector on system
board)
CTRL_DST_PB1 (fPERC input connector)
4 SIG_PWR_2 (system board power connector) BP_PWR_2 (backplane power connector)
5 CTRL_SRC_PB1 (fPERC controller connector) DST_PA2 (backplane signal connector) and
DST_PB2 (backplane signal connector)
6 CTRL_SRC_PA1 (fPERC controller connector) DST_PA1 (backplane signal connector) and
DST_PB1 (backplane signal connector)
7 SL3_CPU1_PA1 (signal connector on system
board)
CTRL_DST_PA1 (fPERC input connector)
8 SL4_CPU1_PB1 (signal connector on system
board)
CTRL_DST_PB1 (fPERC input connector)
Installing and removing system components 125