8 Commissioning
Commissioning with the commissioning software
Installation and Operation Manual for Solar Power Inverter M70A EU V1.1 EN 2020-02-20
94
The message "Sync Time
successful" appears if the
setting was successful.
þ
Commissioning is now complete.