DINO 210XT
67
DAILY INSPECTION (START-UP INSPECTION)
To be always performed at a new work site and in the beginning of every working day.
The inspection is performed by the user.
In the inspection attention shall be paid to the following issues:
- establish the load-bearing capacity of the ground at the lifting site (see the table "maximum
permissible ground pressure for different soil materials" on page 21 for guidelines)
- verify the standing stability of the lift
- control the due operation of the position indicator
- test the operation of the emergency stop system both from the platform and the chassis
control panels.
- test the operation of the emergency descent system both from the platform and the chassis
control panels
- test the alarm signal
- check the warning and signal lights
- check the operation and cleanliness of the lights and reflectors
- check the condition of the operating controls and test all work movements
- check the condition of the access routes, the platform gate and the handrails
- check the operation of the load limit switches (refer to the service instructions).
- check the limit switches, which prevent the operation of the boom movements (refer to the
service instructions)
- check the operation of the limit switches, which block the outrigger movements (refer to the
service instructions).
- check the hydraulic system for tightness
- test the brakes
- check the unit visually
- observe the location of the nearby power lines (refer to the safety distances on page 9)