EasyManua.ls Logo

Dino 210XT - Inspection Guidelines; Initial Inspection Process

Dino 210XT
119 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
DINO 210XT
66
INSPECTION INSTRUCTIONS
All lifting equipment and lifting gear used at a construction site must always be inspected before
use. The lifts and related lifting gear used on a work site shall be subjected to a regular maintenance
inspection; if possible once a week.
Keep a journal of any notable shortcomings and defects observed and advise the foreman of them.
FIRST INSPECTION
The initial inspection and test loading of the Dino access platforms is performed by the
manufacturer. A protocol which accompanies the lift is drawn up of the inspection.

Table of Contents