TEST LOADING INSTRUCTIONS FOR REGULAR INSPECTION
1. Place the lift on an even surface with good carrying capacity. Drive the outriggers to their
lowest position (the minimum support width).
2. Turn the boom to the side from the tow-bar and lower it on the ground.
3. Put a weighed load of 215 kg on the platform (I).
4. Lift the boom to as high as it goes and extend the telescope to its full length (maximum
lifting height).
5. Lower the boom until the safety device stops the movement.
6. Turn the boom round over 360°.
7. Retract the telescope and lower the boom to a horizontal position.
8. Extend the telescope until the safety limit switch RK4 stops the movement. Establish the
standing stability in this situation by turning the lift round over 360°.
9. Carry out the same procedure with a platform load of 80 kg (II).
10. Compare the outreach with the reach diagram. If necessary, readjust as instructed on page 60
"adjustment of the overload limit switches".
After the above mentioned test loadings (case I and case II) and the subsequent inspection have
been completed without finding any defects in the structure or stability of the lift, the lift may be
used provided that the reach and platform load restrictions on page 6 of this manual are observed.
The max. allowed platform load is 215 kg
- in conjunction with the first, i.e. start-up inspection, the lift shall be subjected to a test
loading with an overload of 25% and after that the supporting structures shall be thoroughly
inspected
- In conjunction with the annual inspection the lift shall be subjected to a regular inspection, a
test-run and a test loading with maximum permissible load and a thorough inspection of the
supporting structures
- the first inspection shall be recorded in the start-up inspection protocol and the test-run shall
be recorded in the protocols for the annual and regular inspection