EasyManua.ls Logo

Doosan DVF5000 - Machine Absolute Level Operation

Doosan DVF5000
102 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
31
4. Machine Power-up
4) Turning On the Main NFB
After fully checking the main power connection and voltage, assemble the NFB terminal
block lid and turn the main NFB to “ON” after checking once again that the various
hydraulic hoses, wires and connectors are properly connected.
5) Machine Ready
After checking the motor rotation direction, press the “NC Power ON” Machine
Ready Switch in sequence.
When the
hydraulic motor of the cooling unit begins to turn, check the whole machine
for any abnormality in the hydraulic hoses, etc. or any place where hydraulic or
pneumatic leakage occurs. Then conduct the necessary repairs.
When Machine Ready is done, the current machine status can be checked, and
check the alarms displayed according to the status to solve problems one by one.
NFB
Terminal
Block lid

Table of Contents

Related product manuals