3. Machine Anchoring Operation
3. Machine Anchoring Operation
3.1 Machine Homing Operation
1) Marking
the machine installation site
Mark the exact installation location of the machine using a tape that can be removed
once the machine has been installed.
2) Machine Transport
After transporting the machine to the place of installation, determine the exact position of
installation and place the machine on the factory floor.
(3) Machine Positioning
Measure the machines distance from the surrounding pillars, wall and machinery,
and then gradually move the machine little by little into the exact position of
installation.
If necessary, place wooden boards on the factory floor to protect it from scratches.
Wood
board
Position
marking