Do you have a question about the Doosan DVF5000 and is the answer not in the manual?
Guidance on selecting an appropriate installation site based on temperature, vibration, and floor conditions.
Details on foundation work period, inspection, and the drawing for machine installation foundation.
Steps to prepare for the machine's arrival, including marking the site and preparing power cables.
Instructions for safely transporting the DVF5000 machine using cranes or forklifts.
Ensuring all shipped units and parts are received in good condition to avoid delays.
Steps for marking the installation site, transporting the machine, and positioning it accurately.
Detailed procedures and preparation for securing the machine to the factory floor.
Steps for placing the oil cooler and connecting hoses and wires removed during shipping.
Procedure for removing axis fixtures that prevent movement during shipping.
Connecting the main power line, earth line, and pneumatic source to the machine.
Procedure for setting the zero point and performing absolute level adjustments on the table.
Instructions for installing the leveling jig and performing feed level adjustments.
Measurement and adjustment procedures for the straightness of X-axis movement.
Measurement and adjustment procedures for the straightness of Y-axis movement.
Measurement and adjustment procedures for the straightness of Z-axis movement.
Procedure for measuring and adjusting the cross-squareness between X and Z axes.
Procedure for measuring and adjusting the cross-squareness between Y and Z axes.
Procedure for measuring and adjusting the cross-squareness between X and Y axes.
Measuring and adjusting the squareness between spindle centerline and X-axis movement.
Measuring and adjusting the squareness between spindle centerline and Y-axis movement.
Measuring and correcting squareness between C-axis centerline and X-axis movement.
Measuring and correcting squareness between C-axis centerline and Y-axis movement.
Procedure for measuring and adjusting the parallelism between table top and X-axis feed.
Procedure for measuring and adjusting the parallelism between table top and Y-axis feed.
Measuring and adjusting parallelism between spindle centerline and Z-axis feed.
Measuring the run-out of the spindle's cross section and its adjustment method.
Measuring the run-out of the spindle's internal diameter and correction methods.
Measuring and adjusting the run-out of the table top surface.
Procedure to reset the X and Y axis reference points using Grid Shift adjustment.
Procedure for resetting the Z-axis reference point, including stroke and calculations.
Method for resetting the B-axis reference point using parameter settings.
Procedure to reset the absolute reference point of the C-axis via parameter settings.
Explanation and operation of DCP-i compensation for 5-Axis machining.
Steps for preparing alignment jigs and resetting tool change positions.
Instructions for correctly positioning and connecting the coolant tank.
Steps for reassembling covers that were disassembled for shipping.