EasyManua.ls Logo

Eaton BladeUPS - Page 63

Eaton BladeUPS
160 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Eaton BladeUPS 5 kVA to 60 kVA (N+1) User’s Guide 164201649—Rev 14 49
Figure 35. Securing the Rear Rail
Clip Nuts
5. Repeat Steps 3 and 4 for the other rail.
6. Tighten the assembly wing nuts on both rail assemblies.
CAUTION
The EBM is heavy (see page 139 ). Moving the EBM requires a minimum of two people.
7. Place the EBM on a flat, stable surface with the front of the EBM facing toward you.
8. If the mounting brackets are not already installed, align the two mounting brackets with the screw holes on
the side of the EBM and secure with the supplied 6-32 flat-head screws. ( See Figure 35 ).
9. Attach the EBM front cover:
Align the pins on the rear of the front cover with the openings in the EBM. Push the cover firmly into place.
( See Figure 36 ).
Rack Setup for the EBM

Table of Contents

Other manuals for Eaton BladeUPS

Related product manuals