EasyManua.ls Logo

Ecolab DryExxEco Advanced-ETH - Switch Cabinet - Connections and Interior Fittings

Ecolab DryExxEco Advanced-ETH
196 pages
Go to English
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4.2.2 Switch cabinet - connections and interior fittings
Switch cabinet view: INTERNAL
Fig. 5: Switch cabinet - connections and interior fittings
Switch cabinet installations (left):
1 Motor protection switches
2 Fuses
3 Ethernet connection
4 AC terminals
5 Clamps
6 Cable duct for installations in the door
7 Earthing
8 Cable inlet
9 Head module CAN-Bus, Wago
10 Input and output terminals, Wago
11 Power supply
Switch cabinet door installations (right):
12 Operator panel and control unit
13 Seal
14 Earthing
15 Operating light and fault signal button
16 Main switch
Assembly
DryExxEco control® Advanced-ETH > Switch cabinet - connections and interior fittings
28Rev. 02-09.2017

Table of Contents

Related product manuals