8.2
Commissioning: control unit DryExxEco
®
Advanced-ETH
To be able to carry out the setup process for the technical control system, it is
essential to observe the instructions given in
Ä
Chapter 9 „DryExxEco
control
®
Advanced-ETH“ on page 49 . In particular, the information under
Ä
Chapter 9.3 „Initial Configuration“ on page 51 must be observed!
1. Determine the position.
2.
DryExxEco
®
Assemble the Advanced-ETH as described in
Ä
Chapter
6.3 „Assembly of the control unit (switch cabinet) DryExxEco
®
Advanced-
ETH“ on page 37 .
3. Install the power supply and lines for the enabling signals.
4.
Perform the wiring of the DryExxEco
®
Advanced-ETH to the DryExx®.
5. Carry out the cabling of the section valves.
6.
Following commissioning of the DryExx®
Ä
Chapter 8.1 „Commissioning:
DryExx®“ on page 44 switch on the entire system.
7. Carry out the parameterisation in accordance with the section situation.
8. Enter the parameters for each section into the control.
9. Perform a system test with external enabling signal.
10. Perform a system test with internal enabling signal.
8.2.1 System parameterisation
1. Set valve assignment according to the site conditions.
2. Enter the parameters for each selection valve.
8.3 Operation
Personnel:
n
Operator
n
Specialist
n
T
rained personnel
8.3.1
Automatic mode
When the tasks under
Ä
Chapter 8.1.1 „Filling the pipe system“ on page 45 have been
completed, the control can be set to automatic mode.
If a production signal is generated by the system, the lubrication circuits are activated at
the set times and then shut down sequentially.
Commissioning and operation
Operation > Automatic mode
46Rev. 02-09.2017