Scope of delivery and receiving inspection 8
Manual econ sens3 Version 3.0
3 Scope of delivery and receiving inspection
Scope of delivery for base unit:
Receiving inspection:
The trouble-free and safe operation of this instrument requires proper transport and appropriate
storage, installation, and assembly, as well as careful operation and maintenance, if needed. If it can
be assumed that a safe operation of the instrument is no longer possible, the instrument should be
taken out of operation immediately and secured against unintentional start-up. Unpacking and packing
should be performed with the usual care without the use of force and only with appropriate tools.
Scope of delivery for base unit
econ sens3 Multifunctional Measurement Instrument
(hat-rail module)
econ sens3 Connector Kit
(consisting of 4 pluggable screw terminals)
Accessories available for delivery
econ Coil (Rogowski coil set for current measurement), length 200mm,
measuring range 3 to 400A
econ Coil (Rogowski coil set for current measurement), length 400mm,
measuring range 3 to 3000A
econ sens3 Connector Kit
(consisting of 4 pluggable screw terminals)
econ Standard Power Supply 24V DC for alternative supply of the
instrument over protective extra-low voltage
econ sens3 V-KIT, Safety Test Lead Set for connection to the voltage path
via magnetic probes (for mobile and temporary measurements)
Table 2: Scope of delivery and accessories