EasyManua.ls Logo

Edwards SCU-801

Edwards SCU-801
149 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SCU-801 Control Unit for Turbomolecular Pump
MT-95E-001-A
Page 68
5
SERIAL COMMUNICATION PROTOCOL
Figure 40 - Grounding example (single point grounding)
DO NOT bundle a communication line with a protective earth conductor or a power line.
Moreover, keep away a communication line from the apparatus used as a noise source as much
as possible.
As radio frequency noise measure, place a ferrite core on both ends of the communication cable.
When electromagnetic interference caused by radio frequency noise in frequency band (150 kHz
to 1 GHz) affects communication, attaching ring ferrite cores to the cable is effective to reduce
communication failure.
Figure 41 - Example of ring ferrite core installation
Locate and secure the cables.
It may be difficult to measure the reproducibility of the communication failure without securing the
cables.
Avoid installing a power line and a communication line in the same metallic duct.
When unavoidable, separate a line with a metal separator certainly, and connect the duct
containing a metal separator certainly to GND, or installing a communication line put into
conductive pipes, such as metal.
Communication line
Metallic separator
GND
Power line
Metallic duct
Figure 42 - Example of cable installation in metallic duct

Table of Contents

Related product manuals