EasyManuals Logo
Home>ELTRA>Measuring Instruments>ELEMENTRAC ONHp2

ELTRA ELEMENTRAC ONHp2 User Manual

ELTRA ELEMENTRAC ONHp2
96 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #68 background imageLoading...
Page #68 background image
Maintenance
68
10.7 Maintenance in the furnace area
10.7.1 Changing the seal of the upper furnace closure
CAUTION
C41.0000
Risk of injury
Moving parts
The lock moves according to user input. Hands in the area of the upper
furnace lock can be crushed when the lock closes.
Never reach into a moving lock.
Turn the main switch of the analyser to position 1 or 0.
Press the button “furnace cleaning” on the tab “Analyser status” of the software.
Loosen the fastening screws of the upper furnace cover and remove it upwards.
Loosen the two nuts on the furnace lock assembly
.
Carefully remove the furnace lock assembly upwards and place the assembly
backwards on the analyser.
Please pay attention to the slidingly mounted locking element.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ELTRA ELEMENTRAC ONHp2 and is the answer not in the manual?

ELTRA ELEMENTRAC ONHp2 Specifications

General IconGeneral
BrandELTRA
ModelELEMENTRAC ONHp2
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals