4 Installation
4.1 Storage and transport
The packaging material used to store and
transport the instrument must provide shock
and moisture protection. The original
packaging materials provide the most
effective protection. The ambient conditions
must also meet the requirements (see
Technical data).
4.2 Unpacking
Make sure the contents are undamaged. The
post office or the freight carrier must be
informed of any damage and the supplier
must be notified.
Check the scope of delivery against your
purchase order and the shipping documents:
• Scope of delivery
• Instrument model and version as specified
on nameplate (see Fig. 3.3)
• Accessories (see Chapter 3.7)
• Operating instructions
Keep the original packaging materials in case
the instrument has to be stored or shipped at
a later date.
If you have any questions, please contact
your supplier or the Endress+Hauser sales
agency (see rear page of this document).
4.3 Installation
Wall installation (mounting versions A and B)
Insert the screws in the attachment holes of
the instrument and mount the instrument as
depicted in Figure 4.1.
The holes are covered with plastic caps.
154
∅ 8
142
Fixing screw: ∅ 6mm
Rawl plug: ∅ 8mm
Plastic
caps
167
247
100
PM152WAN.CDR
Fig. 4.1
Dimensions for wall
mounting
Installation Mycom CLM 152
10 Endress+Hauser