Proline Prowirl 73 Commissioning
Endress+Hauser 49
6 Commissioning
6.1 Function check
Make sure that all final checks have been completed before you commission your measuring point:
• Checklist for "post-installation check" ä 24
• Checklist for "post-connection check" ä 34
6.2 Switching on the measuring device
Having completed the function check, switch on the supply voltage.
After approx. 5 seconds, the device is ready for operation! The device then performs internal test
functions and the following message is shown on the local display:
The measuring device starts operating once the startup process is completed.
Various measured values and/or status variables appear on the display (HOME position).
!
Note!
If startup fails, an appropriate error message is displayed, depending on the cause. The error
messages that occur most frequently during commissioning are described in the "Troubleshooting"
section (ä 63).
PROWIRL 73
START-UP
Start-up message
Æ
DEVICE SOFTWARE
V XX.XX.XX
Display of current device software
Æ
0.0000 m3/h
0.00000 m3
Normal measuring mode commences