Maintaining & Troubleshooting
Hardware Installation and Maintenance Manual B
–7
Toreplacethestainlesssteelmirror
If your system has been configured with a stainless steel mirror in the 0.1 m
or 0.8 m measurement cell, use the following instructions to replace the mirror,
if necessary.
1. Power down the analyzer as instructed in the section called
“Powering Down the Analyzer” on page B-2.
2. Isolate the analyzer from the sample bypass flow by shutting off the
appropriate valve(s) and/or pressure regulator.
3. If possible, purge the measurement cell with nitrogen for 10
minutes.
4. Gently remove the mirror assembly from the cell by removing the
socket-head cap screws and set on a clean, stable and flat surface.
If stainless steel mirrors are replacing another version of mirror in
the field, such as glass, the analyzer may need to be returned to
the factory for re-calibration to ensure optimal cell function. Refer
to “Service Contact” on page B-22.
All valves, regulators, switches, etc. should be operated in
accordance with site lock-out/tag-out procedures.
SpectraSensors recommends a sample supply shut-off valve for
the SS500 simplified sample system. This valve is to be installed
by the customer upstream at the sample tap.
Process samples may contain hazardous material in potentially
flammable and/or toxic concentrations. Personnel should have a
thorough knowledge and understanding of the physical properties
and safety precautions for the sample contents before operating
the SCS.
The sample cell assembly contains a low-power, 10 mW MAX, CW
Class 3b invisible laser with a wavelength between 750-3000 nm.
Never open the sample cell flanges or the optical assembly unless
the power is turned off.
Always handle the optical assembly by the edge of the mount.
Never touch the optical surfaces of the mirror.