Document number: ED.03783.00.001.ENG rev 4 Page 130 of 153
Some of the maintenance jobs need extra directions; those directions are given in the table below.
2.1. Pipes, hoses and
brackets
Check on oil leakage and damages
Check if the couplings are tightened well.
Replace all seals within the piping (Waldform)
Replace all plastic brackets
2.2. Couplings and
quick-screw
couplings
Check on oil leakage and damages
Check if the couplings are tightened well.
Replace all seals of the couplings
Replace fast couplings and screw couplings
2.3. Gauges,
measurement
sensors
Check the tightening bolts, nuts and components
Check on damages and paint
Check if the bolts are still tightened
Replace all seals, door seals and inspection hatches
Grease the hinges and locks
Check if the bolts are still tightened