Appendices
A.Checklist for planning
1. Project
Project
Customer
Location
Date
2. the load
Mass of the load
Centre of gravity of the load
Dimensions of the load
The position of the load’s centre of gravity within the units
The wind load
3. Calculations
Bearing capacity of the subsoil
Foundation required?
Height of the required foundation
4. Commitment
Preparations by:
Date:
Signature:
Approved by:
Date:
Signature: