B.Checklist for installing the system
1. Project
2. Installation of the units
Checklist A “Checklist for planning” completed and signed off
The lifting capacity of forklifts and cranes is sufficient
The electrics are installed
The units are put in place
The load is fixed to the swivels with bolts
3. Installation of the trolleys (Optional)
Checklist A “Checklist for planning” completed and signed off
Position the trolleys with its electrical cabinets in such way that the cabinets are on the
outer side of the tracks, away from the load.
The running direction of all trolleys has been adjusted and tested.