EasyManua.ls Logo

Enerpac JS125 - Checklist for Installing the System

Enerpac JS125
153 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
www.enerpac.com
Document number: ED.03783.00.001.ENG rev 4 Page 141 of 153
B.Checklist for installing the system
1. Project
Project
Customer
Location
Date
2. Installation of the units
Checklist A Checklist for planning” completed and signed off
The lifting capacity of forklifts and cranes is sufficient
The electrics are installed
The units are put in place
The units are aligned
The load is fixed to the swivels with bolts
3. Installation of the trolleys (Optional)
Checklist A Checklist for planning completed and signed off
Position the trolleys with its electrical cabinets in such way that the cabinets are on the
outer side of the tracks, away from the load.
The running direction of all trolleys has been adjusted and tested.
4. Commitment
Installations by:
Date:
Signature:
Approved by:
Date:
Signature:

Table of Contents

Related product manuals