EasyManua.ls Logo

ES&S DS850 - Page 198

Default Icon
199 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Index 192
EVS5200_DOC_SOP_DS850
Software Version 2.10
Published: February 26, 2014
O
Operating Status Icons, 21
Operations Support Frequently Asked Questions, 13
Output Trays, adjusting, 9
Overview, 2
P
Perform Scanner Maintenance, 120
Pick Delay, 35
Pick One Ballot, 36
Post-Election Day Tasks, 119
Power Cord Protection, 18
Power Sources, 17
Precinct Labels, 83
Precincts Processed Report, 130
Pre-Election Day Tasks, 48
Pre-Election Maintenance, 49
Printers, 30
Connecting the External Printers, 53
Setting up the Dot Matrix Printer, 54
Setting up the Laser Printer, 55
Printing Election Reports, 102
Processing Mode, 72
Provisional Voting, 4
R
Radiation Protection, 19
Reports, 41, 123
Batch/Bin Report, 129
Menu, 24
Precincts Processed Report, 130
Results Report, 126
System Readiness Report, 132
Zero Report, 124
Reports Menu, 24
Reports menu, 186
Results Report, 126
S
Safety Information, 17
Scan Screen Sort Options, 77
Scanner
Clearing and Initializing,
61
Configuring, 71
Loading the Election Definition, 63
Maintenance, 120
Shutting Down and Powering Off, 119
Starting, 57
Unlocking, 45
Scanning, 91
Scanning Menu, 22
Scanning the Ballots, 91
Screen Calibration, 30
Screen Tilt, adjusting, 8
Select a Precinct, 58
Sensor Status, 36
Servicing, 18
Setting the Date and Time, 26, 66
Setting Up the Dot Matrix Printer, 54
Setting up the Laser Printer, 55
Singular Label, 83
Sort Settings, 74
Specifications and Cautions, 20
Starting the Scanner, 57
Supplies, contacting ES&S, 11
System Acquisition Procedures, 14
System Error Recovery, 138
System Menu, 25
System Messages, 138, 139
System Readiness Report, 132
T
Technical Support Contacts, 11
Tests, 39
Thumb Drives, ES&S Media Device, 7
Timeline for Election Preparation, 13
Transport, 33
Trays, 37
Troubleshooting, 189
U
Uninterruptible Power Supply (UPS), 10
Connecting the Scanner to the UPS, 52
Installing, 51
Maintenance, 121
Turning Off, 120
Turning On the UPS, 56
Unlocking the Scanner, 45
User Access, 28
User Interface, 21
V
Ventilation, 17
View, Set and Test Network IP Address and Folder Path,
136
W
Water and Moisture, 18
Workspace, adjusting, 8
Z
Zero Report, 124

Table of Contents