Installation Checklist
Go through the following checklist to ensure you have installed the appliance correctly
Correctly sized cavity to suit your fascia and flue configuration
Correct clearances to combustibles and mantles around the fascia
An electrical isolating switch to the appliance, accessible after finished installation
Correctly sized gas supply with a pressure test point, ensuring adequate supply with
all other gas appliances in the dwelling running
A weather-tight installed Horizontal or Vertical Flue Terminal with clearance as
specified by AS/NZ5601
Power flue cable connected correctly to the Power Flue Terminal and the electronics tray
within the appliance
Reasonable access to the Horizontal or Vertical Flue Terminal for maintenance
purposes
Flue attached to the rear/bottom of the flue terminal leading back to the
appliance
The appliance fixed to the cavity base
The appliance plugged into a mains electricity supply
All gas joints and pressure points leak tested, and soapy water and drop tests completed on
gas pipework
Gas type conversion process carried out if required
Log or coal fuel bed correctly installed
Primary and secondary glass correctly fitted
A fitted fascia
The remote control mounted on its cradle on a wall
Operated the fire and verified that it lights reliably and safely
Run the appliance on full for an hour with the doors & windows open
Appliance functions checked, including thermostat operation, Flame Eect and Fan
Boost
Home-owner shown how to operate the appliance correctly
Warranty card filled in with installer details and appliance serial number
User Guide made available for end user
Plumbing Industry Commission Compliance Certificate given to end user