Installation Checklist
Go through the following checklist to ensure you have installed the appliance correctly
□ Correctly sized cavity to suit your fascia and flue configuration
□ Correct clearances to combustibles and mantles around the fascia
□ An electrical isolating switch to the appliance, accessible after finished installation
□ Correctly sized gas supply with a pressure test point, ensuring adequate supply with
all other gas appliances in the dwelling running
□ A weather-tight installed Horizontal or Vertical Flue Terminal with clearance as
specified by AS/NZ5601
□ Power flue cable connected correctly to the Power Flue Terminal and the electronics tray
within the appliance
□ Reasonable access to the Horizontal or Vertical Flue Terminal for maintenance
purposes
□ Flue attached to the rear/bottom of the flue terminal leading back to the
appliance
□ The appliance fixed to the cavity base
□ The appliance plugged into a mains electricity supply
□ All gas joints and pressure points leak tested, and soapy water and drop tests completed on
gas pipework
□ Gas type conversion process carried out if required
□ Log or coal fuel bed correctly installed
□ Primary and secondary glass correctly fitted
□ A fitted fascia
□ The remote control mounted on its cradle on a wall
□ Operated the fire and verified that it lights reliably and safely
□ Run the appliance on full for an hour with the doors & windows open
□ Appliance functions checked, including thermostat operation, Flame Eect and Fan
Boost
□ Home-owner shown how to operate the appliance correctly
□ Warranty card filled in with installer details and appliance serial number
□ User Guide made available for end user
□ Plumbing Industry Commission Compliance Certificate given to end user